Case Study: Private networks – shopping centre

Date: April 2024

Duration: 3 Months

Import Capacity: 1.5MVA

The Shopping Centre had a single HV supply cable feeding a three-story shopping centre that had three tenants. iDNO adopted HV network, splitting the shopping centre supply into 3x separate LV metered cables. Reduced credit risk for the landlord (who had initially been taking all risk on the HV incoming supply). Reduced OPEX, REPEX and Carbon footprint.

The numbers

36,201

kWh reduction

9.47

CO2 savings (tonnes, 1 year)

284.1

CO2 savings (tonnes, 30 year)

£12,238

Cost savings (year 1)

£367,140

Cost savings (30 year forecast)


Case Study: EV Retail Portfolio

Date: 2025

Duration: 12 Months

Portfolio Size: 20+

Within 12 months a Real Estate Investment Trust executed an end-to-end EV Charging process to lease completion. Involving grid assessments, procurement and lease negotiations to achieve a rental agreement never seen in the market before.

The numbers

20+

Sites

230

Ultra Rapid Chargers

£60,000

Rent per site (ave.)

20

Term Length (years)

>12 months

Time from concept to lease completion